Hebei medium and heavy cold rolling materials co., ltd. entrusted ocean university of China to undertake the marine environmental impact assessment of the connecting bridge project between nanshugang road and medium and heavy cold rolling. according to the interim measures for public participation in environmental impact assessment (state environmental protection administration, huanfa [2006] No. 28), "Notice on Further Strengthening Public Participation in Environmental Impact Assessment of Construction Projects" (Ji Huan Ban Fa [2010] No. 238), "Notice of the State Oceanic Administration on Strengthening the Publicity of Environmental Impact Assessment of Marine Engineering Construction Projects", the information of this project and the preliminary analysis of environmental impact are now publicized as follows:
Name and summary of 1. construction project
Project name: South Shugang Road and medium and heavy cold rolling connection bridge.
Construction unit: Hebei Heavy Cold Rolling Material Co., Ltd.
Construction site: east of Haiphong Road in Bohai New Area, south of Nanshugang Road and north of medium and heavy cold rolling.
Construction scale: the port bridge spans the landscape river, with a length of 52.75m and a width of 27m, of which the width of non-common plates on both sides is 6 m, the width of some roads for passing vehicles is 15m, and the load of passing vehicles is 200t.
The estimated investment capital of the project is 10 million yuan, and the planned construction period is 15 months.
2. Project Construction Unit and Contact Information
Construction unit: Hebei Heavy Cold Rolling Material Co., Ltd.
Contact: Yang Zhijiang Tel: 0317-5761613
Address: Bohai New District, Cangzhou, Hebei Province
Name and contact information of the environmental impact assessment agency of the 3. project
Marine Environmental Impact Assessment Institution: Ocean University of China
Contact: xu teacher Tel: 0532-66781509
E-mail: 13583260306@163.com
Address: 238 Songling Road, Qingdao City, Shandong Province
Working Procedures and Main Work Contents of 4. Environmental Impact Assessment
1. Working procedures for marine environmental impact assessment:
The marine environmental impact assessment of the Project is mainly divided into three stages:
The first stage is the preparation stage, which is to study relevant documents, collect data, conduct on-site investigation of environmental status and preliminary engineering analysis, determine the project evaluation content, evaluation scope and evaluation grade, and select key evaluation factors and elements;
The second stage is the formal stage, the main work content is to further carry out detailed engineering analysis and environmental status investigation, and carry out environmental impact prediction analysis and evaluation;
The third stage is the preparation stage of the report form, which gives the environmental feasibility assessment and conclusion of the project, puts forward the environmental management and monitoring plan, and gives targeted environmental protection countermeasures and suggestions.
2. Main work contents:
Project overview and analysis, analysis of pollution and non-pollution factors and identification results of evaluation factors, current situation of natural and social environment, analysis of environmental sensitive areas and environmental protection objectives, prediction and analysis of environmental impact during construction and operation, proposal of reasonable and effective environmental protection countermeasures, public participation, and conclusion of environmental impact assessment.
Main matters 5. soliciting public opinions
The main items for public comments on the project are: whether the public knows the project and the basic situation of the project; the public's evaluation of the current environmental quality near the site of the construction project; the public believes that the construction project will have a major impact on the environment during the construction period and after it is completed and put into use; the public's evaluation of whether the project can promote local economic and social development and the public's approval of the construction of the project. If the public has any objection to the project, please contact the project construction unit or EIA unit within 10 days from the date of publicity.
Main ways of 6. public input
The public can contact the project unit or EIA unit by telephone, letter, e-mail, etc. within 10 working days from the date of publicity of the project. The contact information is shown above. In the process of preparing the EIA report, before submitting it for approval, the construction unit will further solicit public opinions by means of publicity and questionnaire.
Hebei Heavy Cold Rolling Material Co., Ltd.
29 May 2015